Bollard Posts

Concrete-filled steel pipe bollards set in footings to protect storefronts, dock doors, gas meters, and equipment from vehicle strikes.

A bollard is a short steel pipe set in a concrete footing and filled with concrete. It exists to absorb a vehicle strike that would otherwise land on a storefront, a dock door, a gas meter or a person.

Three things decide whether it does that job. Fill, because an empty pipe folds on impact. Footing depth, because a bollard set in a shallow hole works loose and leans within a couple of winters. And spacing, four to five feet on centre, close enough to stop a vehicle while leaving room for a cart or a wheelchair.

What's included

  • Layout checked against door swings and drive paths
  • JULIE utility locate before drilling
  • Core drilling through existing concrete
  • Footing excavation below the frost line
  • Schedule 40 pipe set plumb and concrete filled
  • Crowned top, paint or sleeve, patch at grade

How the job goes

  1. Site walk to set locations and pipe size
  2. JULIE locate, then core or excavate
  3. Dig footings, set pipe plumb, pour
  4. Crown tops, paint or sleeve, patch

Related work

We haven't photographed a bollards job yet. These are from our curbs and striping work.

Curb and walk, commercial building: Curbs by All Concrete Pros8 photos

Curb and walk, commercial building

Chicago suburbs

Curb wall: Curbs by All Concrete Pros3 photos

Curb wall

Chicago suburbs

Dock apron cut out and re-poured at a warehouse door2 photos

Loading dock apron replacement

Chicago suburbs

Bollards questions

How much does a bollard cost installed?

It depends on the pipe size, the footing depth, and whether we have to core through an existing slab. We measure on site and send a written per-bollard price, free.

How deep does a bollard footing need to be?

At least 36 inches, and we go to 42 to clear the local frost depth. A rule of thumb is burying a third of the total pipe length.

How far apart should bollards be spaced?

Four to five feet on centre in front of a storefront, close enough that a vehicle cannot pass but a cart or wheelchair still can.

Do bollards have to be filled with concrete?

An empty pipe bends and folds on impact. Filling it makes the pipe act as confinement for a solid core, which is what gives a bollard its stopping capacity.

Summarize this page with AI

Opens your assistant with the question ready. Answers come from the assistant, not from us.

Bollard Posts near you

Related: Concrete Curbs · Parking Lot Striping · Commercial Concrete Floors · Footings & Piers. Updated 2026-09-06.

Free estimate

Free bollards estimate

Same-day callback on weekdays. On-site measurement, written price, permit filed.

(630) 485-9732